AGHA KHAN UNIVERSITY HOSPITAL


  • HVAC duct work in New Purchase office.
  • Installation of AHU’s at New Purchase Office.
  • Renewal of chilled water piping (PPR) in private wards.
  • Chilled Water Piping in School of Nursing.
  • HVAC Duct work in School of Nursing.
  • Annual Maintenance of Multi Cell Cooling Towers.
  • Installation of Fire Fighting System.
  • Steam / Condensate Piping.
  • Installation of Package units in office building
  • Relocation of Existing utilities, City Water, Fire System & Storm Water.
  • Fabrication & Installation of Diesel Storage Tank including piping and Electrification.
  • Construction of RCC Manholes for Storm Water.
  • Fabrication & Installation of MS Shed for Diesel Storage Tank.
  • Installation of Ventillation system for Underground Diesel Storage Tank.
...

BOSCH PHARMA


  • HVAC Renovation project.


  • Installation of Process piping in new building.


  • WFI plant Installation in new building.


  • Utilities Piping for Purified Water System.


  • Major overhauling of Chiller 120 TR 2 nos. (Make : Cool line).


...

GETZ PHARMA


  • Process Piping and Installations in Sterile facility. (WFI, Pure Steam & Gases.)

  • Purified water loop Installation.

  • Design, Fabrication & installation of chiller for jacket water cooling to maintain product temperature 20C - 80C during manufacturing process.

  • Complete HVAC and Piping Job in NPD facility.

  • Installation of Granulation HVAC system.

  • Refurbishment of 250 tons DIAKIN Air-Conditioning Units.

  • Installation of 300 Ton SABRO Air-Conditioning System for Warehouse.

  • Installation of Process piping in New Building Extension Project.

  • Continueed....

...

GETZ PHARMA


  • Design, Fabrication & installation of Plate Heat Exchanger for WFI condenser cooling water, skid mounted closed loop system flow rate 4 cubic meter / Hr.

  • Design, Fabrication & installation of raw water cooling system for new Purified water plant, skid mounted closed loop system, flow rate 10 cubic meter / Hr. to maintain raw water temperature at 20oC.

  • Design , Fabrication & installation of Control panel for WFI and PW loop, PLC based system showing Loop Conductivity, Temperature, Flow and Velocity.

  • Installation of AHU’s for Low RH area including Chilled water piping.

  • Utilities Piping for Water System.

  • Design and development of hot water system for OSD.

  • Installation of New WFI & PW System (Make: Bosch Germany 2013-14).

...

HILAL FOODS


  • Installation of Blister Machines and associated Utilities (02 Machines).

  • Installation of Candy Process with associated Utilities.

  • Installation of UHLMAN Blister with associated Utilities.

  • Electro Mechanical Work in newly developed mouth freshner production facility.

  • Installation of Cake Process machines with associated Utilities.

  • Installation of Tonneli Cream Mixture and Pasturizer including auxillary equipments and utilities.

  • Installation of Beans Coating Machines- Capacity 600 Kgs. x 03 machines with associated Utilities. i-e, Chilled Water, Compressed Air, Potable Water & Plant Steam.

...

ABBOTT


  • Installation of Utilities & Process Piping.


  • Installation of Fire protection system.


  • Installation of Process & Production Machines. i-e, FBD, HSM, LSM, Blender, Blister, Compression, encapsulation & coating machine.

...

BROOKES PHARMA


  • Process Piping Job in New Sterile Facility.


  • Installation of WFI and Purified Water & Pure Steam Generator.


  • Installation of WFI , PW loop & Pure steam piping ( 4000 rft )

...

SANOFI AVENTIS


  • Process Piping Job in Sterile Facility Renovation Work.


  • Installation of WFI plant including piping.


...

HABIB UNIVERSITY


  • Fire Protection System i.e Fire Pumping System, Fire Pumps, Fire Hydrants, Fire Sprinklers etc.


  • HVAC Work in Film Studio, Cafeteria, Student Lounge Lecture Halls & Auditorium


  • Installation of Utilities Piping

...

RECKITT & BENCKISER


  • Installation of Process Piping.


  • Installation of Filling Machine at Household department.


  • Automation work in Tube Filler.


  • Supply of Machinery and Spare parts.

...

SOME OTHERS CUSTOMERS


  • Design, Fabrication and Installation of D.I water system with RO Capacity 25000 lit/regeneration.

  • Installation of Purified water loop.

  • Installation of Utility Piping.

  • Installation of Pure steam Generator including Piping etc - 2014.

  • Chilled Water Piping for Petra Chillers.

  • Design, Fabrication and Installation of 25,000 GPD RO system.

  • Fabrication of Gantry with moveable hoist for transportation department.

  • WFI Loop piping installation.

...

SOME OTHERS CUSTOMERS


  • Process Piping Job in New Sterile Facility

  • Installation of WFI plant including Loop piping Dia. 25mm

  • Refurbishment of DHS ( Dry Heat Sterilizer ) and Autoclave with provision of PLC controls.

  • Renovation of D.I water system

  • Design, Fabrication and Installation of 15,000 GPD RO system plant for Mineral water manufacturer

  • Design and Installation of Deionizer system with R.O Capacity 10,000 liter/regeneration

  • Design, Fabrication and Installation of 30,000 GPD RO system plant for new Cold Storage.

  • Process Piping installation for Soft gel new Facility.

...