HVAC Renovation project.
Installation of Process piping in new building.
WFI plant Installation in new building.
Utilities Piping for Purified Water System.
Major overhauling of Chiller 120 TR 2 nos. (Make : Cool line).
Process Piping and Installations in Sterile facility. (WFI, Pure Steam & Gases.)
Purified water loop Installation.
Design, Fabrication & installation of chiller for jacket water cooling to maintain product temperature 20C - 80C during manufacturing process.
Complete HVAC and Piping Job in NPD facility.
Installation of Granulation HVAC system.
Refurbishment of 250 tons DIAKIN Air-Conditioning Units.
Installation of 300 Ton SABRO Air-Conditioning System for Warehouse.
Installation of Process piping in New Building Extension Project.
Continueed....
Design, Fabrication & installation of Plate Heat Exchanger for WFI condenser cooling water, skid mounted closed loop system flow rate 4 cubic meter / Hr.
Design, Fabrication & installation of raw water cooling system for new Purified water plant, skid mounted closed loop system, flow rate 10 cubic meter / Hr. to maintain raw water temperature at 20oC.
Design , Fabrication & installation of Control panel for WFI and PW loop, PLC based system showing Loop Conductivity, Temperature, Flow and Velocity.
Installation of AHU’s for Low RH area including Chilled water piping.
Utilities Piping for Water System.
Design and development of hot water system for OSD.
Installation of New WFI & PW System (Make: Bosch Germany 2013-14).
Installation of Blister Machines and associated Utilities (02 Machines).
Installation of Candy Process with associated Utilities.
Installation of UHLMAN Blister with associated Utilities.
Electro Mechanical Work in newly developed mouth freshner production facility.
Installation of Cake Process machines with associated Utilities.
Installation of Tonneli Cream Mixture and Pasturizer including auxillary equipments and utilities.
Installation of Beans Coating Machines- Capacity 600 Kgs. x 03 machines with associated Utilities. i-e, Chilled Water, Compressed Air, Potable Water & Plant Steam.
Installation of Utilities & Process Piping.
Installation of Fire protection system.
Installation of Process & Production Machines. i-e, FBD, HSM, LSM, Blender, Blister, Compression, encapsulation & coating machine.
Process Piping Job in New Sterile Facility.
Installation of WFI and Purified Water & Pure Steam Generator.
Installation of WFI , PW loop & Pure steam piping ( 4000 rft )
Process Piping Job in Sterile Facility Renovation Work.
Installation of WFI plant including piping.
Fire Protection System i.e Fire Pumping System, Fire Pumps, Fire Hydrants, Fire Sprinklers etc.
HVAC Work in Film Studio, Cafeteria, Student Lounge Lecture Halls & Auditorium
Installation of Utilities Piping
Installation of Process Piping.
Installation of Filling Machine at Household department.
Automation work in Tube Filler.
Supply of Machinery and Spare parts.
Design, Fabrication and Installation of D.I water system with RO Capacity 25000 lit/regeneration.
Installation of Purified water loop.
Installation of Utility Piping.
Installation of Pure steam Generator including Piping etc - 2014.
Chilled Water Piping for Petra Chillers.
Design, Fabrication and Installation of 25,000 GPD RO system.
Fabrication of Gantry with moveable hoist for transportation department.
WFI Loop piping installation.
Process Piping Job in New Sterile Facility
Installation of WFI plant including Loop piping Dia. 25mm
Refurbishment of DHS ( Dry Heat Sterilizer ) and Autoclave with provision of PLC controls.
Renovation of D.I water system
Design, Fabrication and Installation of 15,000 GPD RO system plant for Mineral water manufacturer
Design and Installation of Deionizer system with R.O Capacity 10,000 liter/regeneration
Design, Fabrication and Installation of 30,000 GPD RO system plant for new Cold Storage.
Process Piping installation for Soft gel new Facility.