Installation of Purified water system (BOSCH Germany).
Design, Fabrication & Isntallation of Cooling System for Cooling Raw Water.
Installation of (Fluid Bed Dryer) Capacity 1200, 300 and 150 Kg Capacity with auxillary equipments (BOSCH Germany).
Installation of Coating Equipments 750 and 150 Kg Capacity (BOSCH Germany).
Installation of Bin Washer (CANAN China).
Installation of Bin Blender Capacity 2500 and 1200 Kg (CANAN China).
Installation of Pharma Lifter.
Refuribishment of Existing Purified Water System including Automation & Control System.
Purified Water Loop Piping (ALFALAVAL).
Process Utilities Piping Work.
Installation of Purified Water System (BOSCH Germany).
Installation of Purified Water Loop Piping (ALFALAVAL).
Utilities Piping for PW System.